承接项目
新闻中心

塑山骨架具体的固定方式!

  制作塑山景观的时候,一般都需要焊接钢结构骨架,用以支撑塑山造型。小型的塑山景观采用角钢结构,大型的塑山体则采用槽钢或工字钢等大型钢结构。钢结构的固定采用焊接和锚固两种方式进行,下面介绍塑山骨架具体的固定方式。
  When making plastic mountain landscape, it is generally necessary to weld steel structure skeleton to support plastic mountain modeling. Small plastic mountain landscape uses angle steel structure, large plastic mountain body uses channel steel or I-beam steel and other large steel structures. The steel structure is fixed by welding and anchoring. The concrete fixing method of plastic mountain skeleton is introduced below.
  一、连接加固与加固件连接
  I. Connection and Reinforcement and Connection of Reinforcement Parts
  钢结构的连接方法就是焊缝、铆钉、普通螺栓和高强度螺栓连接,要根据需要加固的原因、目的、构造以及施工条件,同时还需要考虑结构原有的连接方法方可确定。
  The connection method of steel structure is weld, rivet, ordinary bolt and high strength bolt. It should be strengthened according to the reasons, purposes, structure and construction conditions. At the same time, the original connection method of the structure should be considered.
  钢结构加固一般比较适合采用焊缝连接、摩擦型高强度螺栓连接,也可以依据焊缝和摩擦型高强度螺栓混合连接,当采用焊缝连接时,需采用经评定认可焊接工艺及连接的材料。
  Steel structure reinforcement is generally more suitable for weld connection, friction type high strength bolt connection, can also be based on weld and friction type high strength bolt hybrid connection, when using weld connection, it is necessary to adopt approved welding technology and connecting materials.
济南假山制作
  二、加大构件截面加固
  2. Reinforcement of Increased Section of Members
  在采用加大截面加固钢构件的时候,对于所选择的截面形式要有利于加固技术要求,还要考虑已经有的缺陷和损伤的状况。截面加固完成后,需要进行特定测定,以确定固定的牢固度。
  When strengthening steel members with enlarged cross-section, the selected cross-section form should be conducive to the technical requirements of strengthening, and the existing defects and damage conditions should also be taken into account. After section reinforcement is completed, specific measurements are needed to determine the fixed firmness.
  三、裂纹修复与加固
  3. Crack Repair and Reinforcement
  塑山骨架因为荷载反复作用以及材料的选择、构造、制造、施工安装不当等而产生脆断倾向星裂纹损伤,要设法去修复,修复之前要分析产生的裂纹的原因以及严重性,有针对性的采取改善结构实际工作或进行塑山加固措施。不适宜采用修复加固的构件,要给予拆除更换。
  Because of repeated loading and improper material selection, construction, manufacture, construction and installation, the plastic mountain skeleton tends to be fragile and tends to star crack damage. We should try to repair it. Before repair, we should analyze the causes and seriousness of the cracks, and take targeted measures to improve the actual work of the structure or reinforce the plastic mountain. It is not suitable to use repairing and reinforcing components, so they should be demolished and replaced.
  以上几种加固的方式是塑山骨架的主要固定方式,所有焊接和锚固完成后均要进行测定,同时进行防锈防腐处理。骨架固定完成后将进行塑山的面层制作,面层钢筋与骨架焊接将确定塑山的大体造型。
  The above reinforcement methods are the main fixing methods of the plastic mountain skeleton. After all welding and anchorage are completed, they should be measured, and rust-proof and corrosion-proof treatment should be carried out at the same time. After the fixing of the skeleton, the surface of the plastic mountain will be made, and the welding of the surface steel bar and the skeleton will determine the overall shape of the plastic mountain.
版权所有:济南老王假山水景园林

咨询热线:
13064079165
在线客服